How to Level the Shearing Machine Level

When we first start installing the shearing machine. The shearing machine needs to be leveled. At this point, a spirit level is required. Place it on the working surface of the worktable. Now the bubble is on the left side. This means the right side of the shearing machine needs to be raised. The machine’s […]

Z
ZWCNC Editorial Team
How to Level the Shearing Machine Level

Licensed editorial adaptation

Adapted and localized by the ZWCNC Editorial Team from licensed technical material. The source record is published for traceability.

Technical boundary: confirm machine-specific capacity, configuration and safety requirements against the current quotation, manual and application review.

When we first start installing the shearing machine. The shearing machine needs to be leveled. At this point, a spirit level is required.

Watch the referenced demonstration video

Place it on the working surface of the worktable. Now the bubble is on the left side. This means the right side of the shearing machine needs to be raised.

The machine’s base feet need to be adjusted. Then insert a plate of suitable height. So that the shearing machine is level from left to right. If you're unsure about the specific model or installation requirements, you can refer to the official Brochures for detailed specifications.

Prepare a steel plate about 10mm thick. Place it under the screw of the shearing machine’s base foot. Turn the screw downwards. After it touches the steel plate, loosen the screw nut.

Then use a wrench to tighten it down further. Adjust while. Observing the position of the bubble in the spirit level. The bubble slowly moves toward the center. Keep it in the center position.

Once the spirit level is level. A gap will appear at the bottom of the shearing machine. Find a steel plate of the same thickness as the gap. Insert it under the shearing machine’s base. Loosen the screws.

After loosening the screws, let the inserted steel plate bear the weight. The left-right leveling is then complete. After the left-right leveling is done, place the spirit level vertically. Adjust the front-back level

After adjusting this side’s base foot. You can adjust the rear and the other side's base feet. The same method can be used to level them. If you encounter any challenges during installation or need professional assistance, feel free to contact ZWCNC for support.

Apply this guidance to your production

Share your material, thickness, part drawing, tolerance, and target output with the ZWCNC engineering team for an application-specific equipment review.

Discuss your application

More news, insights, and updates from ZWCNC.

Engineering Support

Ready to explore ZWCNC solutions?

Get in touch with our team for machine recommendations, tooling configuration, or project consultation.

Factory Direct · Evidence Published · Configuration-Based Quotes