Licensed editorial adaptation
Adapted and localized by the ZWCNC Editorial Team from licensed technical material. The source record is published for traceability.
Technical boundary: confirm machine-specific capacity, configuration and safety requirements against the current quotation, manual and application review.
Now we will demonstrate how to install the cutting head. Before installing the cutting head, perform inspection inside a dust-free cabinet. Check whether one side of the optical fiber is contaminated and inspect the fiber surface using a microscope for contamination or dust particles. After inspection, remove the fiber and insert it into the cutting head. Align the fiber with the bayonet connector and first tighten the first locking ring on the bayonet—turning clockwise means locking. After ensuring it is locked, tighten the second locking ring, turn clockwise to secure it, and fix the locking ring firmly. For those using precision machines like the laser cutting machines, make sure every step aligns with manufacturer standards to maintain cutting accuracy.
Use triple-layer adhesive tape to seal the joint area, ensuring tight sealing at the connection points to prevent dust from entering during routine assembly and disassembly and reduce the possibility of dust entry. Use masking tape to seal the junction, and after replacing the lens, reseal immediately with masking tape. Once sealing with tape is completed, install the back plate before the cutting head by fastening the back plate screws. Now mount the cutting head onto the back plate by aligning the four screws on the cutting head with the holes on the back plate, install the screws, and tighten them securely. The cutting head is now mounted on the back plate, and the initial installation of the cutting head is completed. If your system uses a laser cutting machines, ensure to follow the same sealing procedure to maintain synchronized operation efficiency.
Run water through the system for inspection and check for any water leakage. If no leakage occurs, connect the cables. Remove the masking tape; there is a positioning hole on the connector—insert the bayonet and tighten the nut securely. Begin connecting the air line: after removing the tape, remove the cap nut, pass the air tube through the nut, insert it into the connector, push it fully in to prevent air leakage, then screw the nut back on and tighten the screws using a wrench. We are using the 683 model cutting head, equipped with the intelligent Eagle Eye vision system, therefore we need to add an air tube to activate the Eagle Eye system. Connect the air tube; all air and water pipes are connected.
After completing the pipe connections, ensure to run water first to check for leaks, then switch on the power. This type of quick-connect fitting can be replaced with screw-type quick fittings if needed. For more technical support or professional guidance on installation and machine maintenance, feel free to contact ZWCNC.
Apply this guidance to your production
Share your material, thickness, part drawing, tolerance, and target output with the ZWCNC engineering team for an application-specific equipment review.
More news, insights, and updates from ZWCNC.

How to Prevent Burn Marks During Laser Cutting: A Troubleshooting Guide

Fiber Laser Cutting Machine Maintenance Checklist and Schedule

Fiber Laser Cutting Machine Maintenance, Safety, and Troubleshooting

Laser Cutting Problems and Solutions: Fast Defect Diagnosis

Fiber Laser Cutting for HVAC Ductwork: Throughput, Quality, and ROI

